Archive for November, 2007

Kitchen Remodel Update, 11/08/07

Thursday, November 8th, 2007

Still no door knobs and drawer pulls but our cabinet installer Mickey did the finish on the trim work for the crown moldings and the toe kicks and it looks great.

110807kitremod (1) 110807kitremod (2) 110807kitremod

110807kitremod (3) 110807kitremod (4)

110807kitremod (6)110807kitremod (5)

110807kitremod (7) 110807kitremod (8)

Backsplash Layout Details:

Tuesday, November 6th, 2007

We’re getting lots closer to being finished with Kay’s new kitchen with mostly just trim work left to do. If you look closely at the top of the cabinets you’ll see that the crown molding is not yet installed and at the bottom of the base cabinets the toe kicks haven’t been installed either. And we are still waiting for the door knobs and the drawer pulls, they are supposed to be in on the 7th of this month… that’s tomorrow!… we hope.

Here are a few pictures of the progress…

We’ve included the backsplash takeoff details as we getting ready to do ceramic tile in that area.


Height from countertop to bottom of cabinets = 14 ¾ inch.
Linear distance:

Corner to end of countertop by fridge: 37 ½ inch Corner to edge of cabinet by fridge: 36 ¼ inch
110607kitremod (14)

Corner to right side of window frame: 76 ⅛ inch Area under window frame & over the sink: 44 ½ inch X 4 ¾ inch
110607kitremod (10)

Behind stove, from the floor to the bottom of the range hood: 30 X 57 ½ inch

110607kitremod

Corner to left side window frame: 87 ½ inch

110607kitremod (12)

Corner to bump out: 53 ¼ inch Bump out to edge of countertop (left side): 40 ¾ inch Bump out to edge of cabinet (left side): 10 ¾ inch
110607kitremod (11)

The Bump Out! disturbed

110607kitremod (15)

110607kitremod (2) 110607kitremod (3)

110607kitremod (4) 110607kitremod (5)

110607kitremod (7) 110607kitremod (9)

110607kitremod (16)110607kitremod
110607kitremod (17)